Bag House Fan and Pre-Heater Fan

Engineering, manufacturing, supply, erection, testing and commissioning of an electrical project on EPC basis.

Cement, Metals & Minerals
Cement, Metals & Minerals
Result

The site was handed over about two years ago and has been running successfully since.

Cement production is a very energy-intensive process, and much of that energy is consumed by electric motors. Many of these motors still run at full speed regardless of actual output, wasting a tremendous amount of energy. In many applications, energy use can be cut by up to 30 percent by controlling motors with variable speed drives.

The customer is one of the leading cement manufacturers in India — a multi-location, multi-unit group with presence in mining, iron & steel, power, media, infrastructure development, logistics and transportation.

Cement, Metals & MineralsProject data
Application
Bag house fan & pre-heater fan
Project scope
Electrical EPC — engineering to commissioning
Customer
A leading cement manufacturer in India
Sector
Cement, Metals & Minerals
Delivered by
Ethan Power Pvt. Ltd.
01

01Project highlights

  • Order received from the customer at a premium over competitors.
  • Supreme benefits of energy efficiency achieved.
  • Complete project handed over in the agreed time, meeting an aggressive delivery requirement.
  • Zero safety or security incidents during the entire execution.
  • All stringent guidelines of the customer and authorities met.
02

02Where VFDs work in cement plants

  • Induced draft (ID) / forced draft (FD) fans
  • Baghouse fans
  • Preheater tower fans
  • Kiln gas fans
  • Clinker cooler exhaust fans
  • Cement mills, raw mills and coal mills
  • Conveyors and separator fans
  • Rotary kilns
03

03Benefits of variable speed drives

  • Lower energy consumption and CO₂ emissions
  • Minimised mechanical wear of equipment
  • Higher process quality and efficiency
  • Increased productivity and throughput
  • Less investment in network compensation devices such as filters
Result

The site was handed over about two years ago and has been running successfully since.

Get in touch

Talk to our
engineers

OfficeC-814 & 815, Noida One, Sector 62,
Noida, Uttar Pradesh

Tell us about your plant, motors and running hours — our engineers will come back with a feasibility view and, where it makes sense, a guaranteed energy-savings proposal.