MV Drive Solution for Boiler Feed Water Pump

Replacing throttling control with a 6.6kV VFD — 2 × 1600 kW pumps on a 60 MW unit.

Power
Power
Result

A turnkey VFD retrofit that turned the plant’s biggest auxiliary loads into an energy-saving opportunity.

One of the leading energy companies producing and distributing electricity in Uttar Pradesh, with a 60 MW unit in production since 2009. Most high-power auxiliaries ran 6.6kV motors with speed control methods other than VFDs.

PowerProject data
Application
Boiler feed water pumps, 2 × 1600 kW, 6.6kV
Project scope
Turnkey civil & electrical, energy-saving based
Customer
A power plant in Uttar Pradesh · 60 MW unit
Sector
Power
Delivered by
Ethan Power Pvt. Ltd.
01

01Challenges

  • Fixed-speed pumps controlled by throttling or fluid coupling at part load reduce plant efficiency tremendously.
  • A retrofit — selecting a VFD for the existing motor.
  • A 2-motors-1-VFD scheme with both VFD and DOL bypass operation.
  • Limitations of the existing building.
  • Assuring the return on investment, against stiff competition.
02

02Solution

  • Started with an energy-saving-based proposal and a full energy saving report.
  • Converted into a turnkey civil & electrical package: 1600 kW 6.6kV VFD, 2 MVA transformer and bypass isolator panel.
  • Achieved the 2-motors-1-VFD scheme with VFD and bypass DOL operation.
03

03Key features & benefits

  • Boiler feed pumps are among a power plant’s biggest energy consumers — variable speed raises plant efficiency significantly.
  • Reduced maintenance of feed-water throttling valves.
  • > 98% converter efficiency, Direct Torque Control, retrofit-ready for standard MV motors.
  • Drives act as soft starters — no starting current peaks on the network.
Result

A turnkey VFD retrofit that turned the plant’s biggest auxiliary loads into an energy-saving opportunity.

Get in touch

Talk to our
engineers

OfficeC-814 & 815, Noida One, Sector 62,
Noida, Uttar Pradesh

Tell us about your plant, motors and running hours — our engineers will come back with a feasibility view and, where it makes sense, a guaranteed energy-savings proposal.